Experienced in supplying full package consultancy services in making: planning thermal power complexes, F/S, technical design, bidding documents, bid evaluation, negotiation and contracting, supporting owner in project management, supervising, commissioning, acceptance and put the plant into commercial operation
Invest in Duyen Hai 3 thermal power plant
Providing consulting services for throughout implementation process of construction investment of thermal power plant, including:
- Pre-construction phase: elaboration and appraisal of Location planning, Pre-feasibility Study report (Pre-FS), Feasibility Study report (FS), construction design comprising Preliminary Design for Pre-FS, Basic Design for FS).
- Construction phase: elaboration and appraisal of construction design (technical design or FEED, detailed design and other design steps), cost estimation; preparation of Bidding Document, evaluation and selection of construction contractor; construction supervision, payments of completed quantity; testing and acceptance of construction works and other necessary tasks.
- Completion phase: contract finalization, warranty of construction.
LIST OF IMPLEMENTED PROJECTS
Chú thích / Note:
QH: Quy hoạch địa điểm BCNCTKT: BCNC tiền khả thi TĐC: Báo cáo đền bù tái định cư TMĐT: Tổng mức đầu tư TKKT: Thiết kế kỹ thuật GSTC: Giám sát thi công xây dựng TTĐL: Trung tâm điện lực |
KS: Khảo sát BCNCKT: Báo cáo nghiên cứu khả thi ĐTM: Báo cáo đánh giá tác động môi trường TKCS: Thiết kế cơ sở BOT: Xây dựng-Vận hành-Chuyển giao CĐT: Chủ đầu tư NMĐ: Nhà máy điện |
Pre-Fs: Pre-feasibility study FS: Feasibility study RP: Resettlement plan EIA: Enviromental impact assessment PC: Power complex TPP: Thermal power plant CCPP: Combined-cycle power plant |
Stt No |
Dự án Project |
Công suất
Capacity
|
CĐT Owner |
QH Planning |
KS Investi -gation |
BC NCKT FS |
TĐC RP |
ĐTM EIA |
TKCS Basic Design |
TMĐT Cost Est. |
TKKT FEED |
GSTC Const. Supervision |
I. NMĐ Đốt Than / COAL-FIRED THERMAL POWER PLANT PROJECTS |
||||||||||||
1 | TTĐL Nghi Sơn Nghi Son PC |
1800MW | EVN | 2004 | 2004 | |||||||
2 | NMĐ Nghi Sơn 1 Nghi Son 1 TPP |
2x300MW | EVN | 2006 | 2006 | 2006 | 2006 | 2006 | 2006 | 2008 | 2014 | |
3 | NMĐ BOT Nghi Sơn 2 Nghi Son 2 BOT TPP |
2x600MW | Marubeni &Kepco |
2014 | 2014 | 2014 | 2014 | 2014 | ||||
4 | TTĐL Quảng Trạch Quang Trach PC |
2400MW | PVN | 2008 | 2008 | |||||||
5 | TTĐL Quảng Trị Quang Tri PC |
2400MW | MOIT | 2013 | 2013 | |||||||
6 | TTĐL Long Phú Long Phu PC |
4400MW | PVN | 2007 | 2007 | |||||||
7 | NMĐ Long Phú 1 Long Phu 1 TPP |
2x600MW | PVN | 2008 | 2008 | 2008 | 2008 | 2008 | 2008 | |||
8 | NMĐ BOT Long Phú 2 Long Phu 2 BOT TPP |
2x600MW | TATA Power | 2015 | 2015 | 2015 | 2015 | 2015 | ||||
9 | NMĐ Vĩnh Tân 4 Vinh Tan 4 TPP |
2x600MW | EVN | Ongoing | ||||||||
10 | NMĐ Vĩnh Tân 4 MR Vinh Tan 4 Ext. TP |
1x600MW | EVN | 2015 | 2015 | 2015 | 2015 | Ongoing | ||||
11 | NMĐ Duyên Hải 3 Duyen Hai 3 TPP |
2x600MW | EVN | 2009 | 2009 | 2009 | 2009 | 2009 | 2009 | Ongoing | ||
12 | NMĐ Duyên Hải 3 MR Duyen Hai 3 Ext. TPP |
1x600MW | EVN | 2013 | 2013 | 2013 | 2013 | 2013 | 2015 | |||
13 | NMĐ Sông Hậu 1 Song Hau 1 TPP |
2x600MW | PVN | 2009 | 2009 | 2009 | 2009 | 2009 | 2009 | |||
14 | NMĐ Sơn Động Son Dong TPP |
2x100MW | Vinacomin | 2010 | ||||||||
15 | NMĐ Mạo Khê Mao Khe TPP |
2x220MW | Vinacomin | 2013 | ||||||||
II. NMĐ TUABIN KHÍ / COMBINED CYCLE POWER PLANT PROJECTS |
||||||||||||
1 | NMĐ Khí Ô Môn IV O Mon IV CCPP |
750MW | EVN | 2007 | 2007 | 2007 | 2007 | 2007 | 2007 | 2010 | Ongoing | |
2 | Đuôi hơi Phú Mỹ 2.1 Phu My 2.1 Extension Add-on, CCPP |
165MW | EVN | 2002 | 2002 | 2002 | 2002 | 2002 | 2002 | 2005 | ||
3 | NMĐ Khí Bà Rịa Ba Ria 306-2, 56 MW, CCPP |
56MW | EVN | 1998 | 1998 | 1998 | 1998 | 1998 | 1999 | 2001 |